Raw unpainted attic interior with exposed rafters and sagging insulation
Attic Finishing — Serving the Northeast

What's hiding
above your ceiling?

We scrape, prime, and seal the attic you've been ignoring — turning eight hundred square feet of regret into the room you actually need. Flat rates. One crew. Done in a day.

847 attics finished
Same-day estimates
Flat-rate pricing
Scroll
Real Work. Real Attics.

Three attics. Three transformations.
Drag the line.

Dark attic with exposed raw rafters, dust, and sagging insulation before cleaning
Before
Bright white sealed attic with clean surfaces and organized storage after finishing
After
Project 01 — Storage Attic

Seal & Brighten

Westchester, NY320 sq ft
What We Did

Scraped loose debris and old insulation remnants.

Primed raw OSB and rafter faces with vapor-blocking primer.

Two coats of flat white sealant on all surfaces.

Sealed joists and rim boards.

Six hours.

The Result

A storage attic that no longer smells like 1987. Clean walls, bright surfaces, no more cobwebs reforming overnight.

Partially converted attic loft with incomplete drywall and exposed framing
Before
Finished attic loft with painted walls, clean rafters and professional appearance
After
Project 02 — Half-Converted Loft

Full Prime & Paint

Hoboken, NJ480 sq ft
What We Did

Demolished partial drywall that wasn't up to code.

Primed entire cavity — rafters, subfloor, knee walls.

Painted knee walls in warm white, rafters in charcoal.

Sealed all penetrations and HVAC rough-ins.

Eight hours.

The Result

Went from a half-finished embarrassment to a loft office that photographs like a Brooklyn rental. Owners listed it four weeks later.

Large raw attic space with bare rafters, insulation and construction debris
Before
Fully converted bright attic room with painted walls ready for furniture and habitation
After
Project 03 — Full Room Conversion

Finished Room Prep

Greenwich, CT640 sq ft
What We Did

Full debris removal and structural inspection.

Spray-primed entire space including roof deck.

Feature wall in deep slate, all else in bright white.

Installed blocking for future drywall and electrical.

Sealed and painted all exposed structure.

Two days.

The Result

A nursery-ready attic. The family moved the crib up three weeks after we finished. The room is warmer, quieter, and brighter than the floors below it.

Transparent Flat-Rate Pricing

No surprises.
No hidden prep fees.

Every package is priced by the square foot. No change orders unless you add scope. What you see below is what you pay.

Your attic size400 sq ft
1001,200 sq ft
Seal & Brighten
$1,120est. for 400 sq ft

For attics that just need light and air.

  • Full debris sweep and prep
  • One coat vapor-blocking primer
  • Two coats flat white sealant
  • Joist and rim board sealing
  • Cleanup and haul-off

Best for storage and basic cleanup.

Finished Room Prep
$2,600est. for 400 sq ft

The attic becomes the room.

  • Everything in Full Prime & Paint
  • Structural blocking for drywall
  • Electrical rough-in prep
  • Insulation coordination
  • Full paint — walls, ceiling, floor
  • Ready for drywall or direct furnish

For nurseries, offices, and bedrooms.

Prices based on accessible attic with standard ceiling height. Complex geometry or remediation needs quoted separately — always before we start.

Free Photo Assessment

Not sure what
you're working with?

Take three phone photos of your attic — one of the floor, one of the rafters, one of the access hatch. Send them here. We'll text you a ballpark number by end of day.

Three photos is all we need
Same-day estimate by text
No obligation. No sales call.

Drop photos here or browse

Up to 3 photos · JPG, PNG, HEIC

0

Attics Finished

0k

Thousand Sq Ft Sealed

0%

Same-Day Completions

0.0/5

Average Rating

From Homeowners

"We were quoted $34,000 for a bump-out addition. Loft came in at $2,800 and the attic is now our daughter's bedroom. It's the best-lit room in the house."

Portrait of Margaret Holloway, homeowner from Scarsdale NY

Margaret Holloway

Scarsdale, NY

Finished Room Prep — 580 sq ft

"I flip houses. I've used three different attic crews over six years. These are the only ones who showed up on time, finished in one day, and left the space cleaner than they found it."

Portrait of Derek Asante, house flipper from Hoboken NJ

Derek Asante

Hoboken, NJ

Full Prime & Paint — 440 sq ft

"The photo assessment was the thing that got me. I uploaded three pictures at 8pm on a Tuesday. By noon Wednesday I had an exact price and a crew date. That's how every contractor should work."

Portrait of Priya Nair, homeowner from Greenwich CT

Priya Nair

Greenwich, CT

Seal & Brighten — 290 sq ft

Your attic is costing you money.

Every month it sits unfinished is a month you're not using the square footage you already own.